Wastewater Treatment for Our New Home (Phase 3)
NPH Nicaragua - (P-NIC-10045)

One of our new buildings in construction
One of our new buildings in construction
Thanks to the generosity of donors, now our children can be all together in Casa Padre Wasson. The new home in Jinotepe will have a capacity of 500 children once all the constructions are finished. One of our most urgent needs for the moment is the third phase of our decentralised wastewater treatment system (for the kitchen, vocational workshops, administration offices and clinic, but especially for the elementary and secondary school since the school building will be needed for the next school year starting February 2011).

The design for the third phase of our wastewater treatment system will be the same as in phase one and two. It was developed by German engineer Guenther Klatte and has proved it´s value in phase one and two. We will use the same filter system and continue to achieve a fully biological purification according to the legal environmental standards in Nicaragua. The treatment system works without electricity or added chemicals. The treated wastewater will be used for irrigation of green areas, gardens and our agricultural programs in order to save the valuable asset on the property, our clean drinking water from the well.

If you have any questions about this project, please contact your nearest fundraising office. Click "Sponsor Project" to give an online donation. We are very grateful for any amount you can donate.

 

Description Qty x Unit = Total Donated Needed
 Septic: Excavation, walls and floors covered with concrete, pipes and filler materials. 1 x Co$262,624.67 = Co$262,625 Co$229,226 Co$33,398
 Biofilter: Excavation, Beams and columns, Concrete reinforced floor, Filling materials, Pipes and accessories, Channel distribution pipes, Brick walls and plaster. 1 x Co$423,749.31 = Co$423,749 Co$418,760 Co$4,990
 Bulk Tank: Excavation, Walls and floors covered with concrete, Pipes and pumps (includes electricity) 1 x Co$156,929.82 = Co$156,930 Co$156,920 Co$10
      Others: Elevated tank, Metal tower structure, Pipes for elevated tank etc. 1 x Co$391,039.43 = Co$391,039 Co$391,069 Co$-29
 Administration Cost 1 x Co$185,153.91 = Co$185,154 Co$185,148 Co$6
Estimated Project Cost (NIO)  Co$1,419,497 Co$1,381,123 Co$38,374
Sponsor Project
(Note: the project cost includes a 10% premium to support the general needs of NPH and its children.)

 


 